Akron Canton Airport Entrance Road

Point Design Group identified alternatives that not only improved the pavement conditions, drainage, and lighting on the Akron-Canton Airport entrance road and parking areas but also reduced congestion in front of the terminal and simplified ingress and egress.
Canton-Walnut Avenue Corridor Complete Streets

This project marks Ohio’s first “Contraflow” bike lane and Stark County’s first dedicated bike lane. Point Design Group received three awards for this Canton, Ohio project, in 2014.
TUS-77-32.72 Multi-Use Bridge

Point Design Group team was hired by the Stark Park District to complete the planning and design for this bridge over IR-77 that reconnects the Ohio & Erie Canal Towpath between Fort Laurens in Bolivar and the Village of Zoar.
Cuyahoga Falls Downtown Transformation Design-Build Project

Point Design Group teamed with H.R. Gray of Akron, Ohio, for this new $9.9 million Downtown Transformation Design-Build Project.
Liberty Street Bridge Design-Build

Point Design Group teamed with Marucci & Gaffney for a design-build project to replace a deficient steel truss bridge over Camp Creek and a concrete dam in Garresttsville, Portage County, Ohio.
Kennard Road Bridge – MED-CR 78-0.91

Point Design Group was hired by the Medina County Engineer for the replacement of a deficient single span steel beam bridge.
Sippo ValleyTrail Bridge #4

The Point Design Group was the design engineer for the Sippo Valley Trail Bridge #4. This new bridge spans the West Sippo Creek Tributary in the City of Massillon in Stark County.
City of Green Resurfacing Projects

The Point Design Group has worked for The City of Green preparing plans and quantities to mill and resurface various roadways within the city limits.
General RV

The Point Design Group team worked to complete the design and submitted the first plans to the City of Green in less than two weeks. We used our in house wetland scientist to keep the project moving with reviewing and permit agencies.
Chesapeake Energy Office Complex

The Point Design Group team followed this project from conceptual design through construction administration services.