Housing Authority of the City of Pittsburgh
Point Design Group was hired by the Housing Authority of the City of Pittsburgh for the Glen Hazel Community new outdoor basketball facility.
Point Design Group was hired by the Housing Authority of the City of Pittsburgh for the Glen Hazel Community new outdoor basketball facility.
To accommodate tournament play, the new facility has new high mast lighting, an audio announcing system, and a concession stand for refreshments. The overall dimensions of the basketball court are 84 feet long by 50 feet wide.
Point Design Group provided design of the new pavement for the court, concrete curbing, fencing, bleachers and benches, and the concession stand. We also provided the design for repairs to and new hand railing for two sets of stairs leading up to the basketball court and for a Redi-Rock retaining wall. PDG prepared the technical specifications and contract drawings for the building and site preparation.
Project Client:
Housing Authority of the City of Pittsburgh
Project Location:
Pittsburgh
Services Included:
Civil Site Design
Surveying
Structural Design

Point Design Group was hired by the Housing Authority of the City of Pittsburgh for the Glen Hazel Community new outdoor basketball facility.

Point Design Group was hired by Turner Construction to provide stakeout services for the Mill 19 Project.

Four consecutive task order renewals have never been commissioned to the same firm through ODOT District 4. This is a testimony to our quality work and our quality service to our client and the confidence ODOT has in the Point Design Group team.

Point Design Group offers U.A.V. (drone) surveying and mapping to produce results faster and more economically than other methods.

Point Design Group provided a base topographical survey, mapping and construction staking for the new BigShots Golf Facility located at 600 Swartz Road in Akron, Ohio. The facility includes 44 climate-controlled tee boxes with Trackman Range technology and gaming area, sports bar and restaurant.

The survey included a topographic survey and cross sections of 50 feet intervals, 75 feet either side of the proposed centerline of trail and staking the proposed centerline of the trail at all angle points a maximum of 100 foot spacing.