800-394-8817

Projects

We’re bringing together the best of Morris Knowles & Associates and Hammontree & Associates to create a stronger, more dynamic future — for our clients and our team.

Sippo ValleyTrail Bridge #4

Point Design Group was the design engineer for the Sippo Valley Trail Bridge #4.  This new bridge spans the West Sippo Creek Tributary in the City of Massillon in Stark County.

The 90 foot long, 10 foot wide, bridge replaced a timber railroad bridge in poor condition. The new single span structure takes the place of a rotted 6 span timber beam bridge, greatly improving the flow characteristics. Concrete abutments founded on steel piling were designed to support the prefabricated bridge truss. Point Design Group also performed the field survey and coordinated with a geotechnical engineer for the project.

Facebook
X
LinkedIn
Email
WhatsApp

Project Client:

The City of Green

Project Location:

Stark County

Services Included:

Bridge Design

Site Survey

Trail Design

Hydraulic Calculations

Transportation

St Clair Township – CBDG Road Paving

Point Design Group was contracted by St. Clair Township in Westmoreland County to provide engineering design and construction period services on three roadway widening and surfacing projects within the Township.

View Project
Transportation

Ohio & Erie Canal Aqueduct

The 14-foot wide bridge reconnects the Ohio & Erie Canal towpath at a location where an aqueduct once transported canal boats over the river. The reemergence of the towpath as a recreational corridor was the driving force in providing this safe passage along this section of the towpath.

View Project
Transportation

Akron Canton Airport Entrance Road

Point Design Group identified alternatives that not only improved the pavement conditions, drainage, and lighting on the Akron-Canton Airport entrance road and parking areas but also reduced congestion in front of the terminal and simplified ingress and egress.

View Project
Transportation

TUS-77-32.72 Multi-Use Bridge

Point Design Group team was hired by the Stark Park District to complete the planning and design for this bridge over IR-77 that reconnects the Ohio & Erie Canal Towpath between Fort Laurens in Bolivar and the Village of Zoar.

View Project