Liberty Street Bridge Design-Build

Point Design Group teamed with H.R. Gray of Akron, Ohio, for this new $9.9 million Downtown Transformation Design-Build Project. This project features the transformation of a pedestrian mall to a two-way roadway with pedestrian amenities and the conversion of two one-way streets to two way.

Point Design Group developed design plans for the roadway including curb and gutter, sidewalk, pedestrian crossings, storm drainage, and water and sewer relocation. The project also contained landscaping, improvements to an existing parking deck, stair tower, and the relocation of two fountains. Point Design Group worked with IBI Group and Horn Engineering for updates to the signals and lighting within the project corridor. 

Facebook
X
LinkedIn
Email
WhatsApp

Project Partner:

H.R. Gray - IBI Group

Project Location:

Summit County

Services Included:

Drainage Design

Roadway Design

Structural Design

Landscape Architecture

Survey Base Mapping

Construction Staking

Transportation

St Clair Township – CBDG Road Paving

Point Design Group was contracted by St. Clair Township in Westmoreland County to provide engineering design and construction period services on three roadway widening and surfacing projects within the Township.

View Project
Transportation

Ohio & Erie Canal Aqueduct

The 14-foot wide bridge reconnects the Ohio & Erie Canal towpath at a location where an aqueduct once transported canal boats over the river. The reemergence of the towpath as a recreational corridor was the driving force in providing this safe passage along this section of the towpath.

View Project
Transportation

Akron Canton Airport Entrance Road

Point Design Group identified alternatives that not only improved the pavement conditions, drainage, and lighting on the Akron-Canton Airport entrance road and parking areas but also reduced congestion in front of the terminal and simplified ingress and egress.

View Project
Transportation

TUS-77-32.72 Multi-Use Bridge

Point Design Group team was hired by the Stark Park District to complete the planning and design for this bridge over IR-77 that reconnects the Ohio & Erie Canal Towpath between Fort Laurens in Bolivar and the Village of Zoar.

View Project