Bellwood Borough Authority Waterline Replacement Project
The Bellwood Borough Authority contracted Point Design Group to assist them in preparing plans and specifications, contract award administration and construction observation.
Point Design Group worked with the School District to bring the contract documents into compliance with a potential funding source for their building renovations grant. This project eventually was tied into the grant with no general funds being used for construction.
Penn Trafford School District requested Point Design Group to assist in preparing plans and specifications and contract award administration for pipe bursting sections of badly broken sanitary sewer lines next to and around their football stadium due to sewer water escaping and penetrating through an embankment onto neighboring property. Due to an existing storm in close proximity of the sanitary sewer line as well as steep slopes made it difficult to replace the broken sewer line by conventional means. PDG designed and bid out replacement of the 8” (1300 LF) sanitary sewer line by the use of pipe bursting process along with replacement of six (6) old brick manholes with new pre-cast manholes.
Project Client:
Penn Trafford School District
Project Location:
Westmoreland
Services Included:
Design
Plan Preparation
Easement Plats
Construction observation
Bidding
Surveying

The Bellwood Borough Authority contracted Point Design Group to assist them in preparing plans and specifications, contract award administration and construction observation.

Penn Trafford School District requested Point Design Group to assist with preparing plans and specifications and contract award administration for pipe bursting sections of badly broken sanitary sewer lines next to and around their football stadium due to sewer water escaping and penetrating through an embankment onto neighboring property.

Point Design Group was hired by the Upper Tyrone Township Sewage Authority to design a new sanitary system for 602 residents which had failing private on-lot systems.

Point Design Group performed the surveying and design of the 2,700 feet of 12 inch waterline and 100 feet of 8 inch waterline.

Point Design Group was hired by the City of Canton to design the bank stabilization and 72″ sanitary sewer replacement for an area where the bank was slipping towards the creek.

Point Design Group is the engineer for the Village of Lakemore and was hired to design a replacement 6 inch waterline approximately 890 feet long along Martha Avenue in the Village of Lakemore.