Bellwood Borough Authority Waterline Replacement Project

The Bellwood Borough Authority contracted Point Design Group to assist them in preparing plans and specifications, contract award administration and construction observation.
Penn Trafford School District Sewer Repair

Penn Trafford School District requested Point Design Group to assist with preparing plans and specifications and contract award administration for pipe bursting sections of badly broken sanitary sewer lines next to and around their football stadium due to sewer water escaping and penetrating through an embankment onto neighboring property.
Upper Tyrone Township Sanitary Sewer Project

Point Design Group was hired by the Upper Tyrone Township Sewage Authority to design a new sanitary system for 602 residents which had failing private on-lot systems.
Marquardt Water Line

Point Design Group performed the surveying and design of the 2,700 feet of 12 inch waterline and 100 feet of 8 inch waterline.
Allenford Drive S.E. Stream Bank Restoration and Sewer Repair

Point Design Group was hired by the City of Canton to design the bank stabilization and 72″ sanitary sewer replacement for an area where the bank was slipping towards the creek.
Village of Lakemore – Martha Avenue Waterline Replacement

Point Design Group is the engineer for the Village of Lakemore and was hired to design a replacement 6 inch waterline approximately 890 feet long along Martha Avenue in the Village of Lakemore.
MWCD Piedmont Lake Marina and Campground

Point Design Group provided civil site engineering and design services for the Muskingum Watershed Conservancy District (MWCD) Piedmont Lake Marina and Campground in Freeport, Ohio.
Seneca Lake – Chestnut Grove WWTP Improvements

Point Design Group was hired by MWCD to evaluate alternatives to improve its lagoon WWTP that discharges into Seneca Lake.
Village of Lakemore Water Tower

Point Design Group designed a new water tower and led critical upgrades to the Village’s utility infrastructure to support long-term reliability and growth.
Village of East Canton – Water Tower Rehabilitation and Center St. Water Line Replacement

Point Design Group enabled the Village to cost-effectively rehabilitate the water tower and replace the water main with no disruption to the Village’s water supply.